Start date: July 2018
Location: Browse Basin, NW Australia
Source: National Offshore Petroleum Safety and Environmental Management Authority, accessed: 2020-01-05
Gas to undergo preliminary processing on an offshore central processing facility (CPF) to remove water and raw liquids, including the greater part of the condensate. Condensate pumped to the interlinked floating production, storage, and offtake facility (FPSO) with hydrocarbon processing and monoethylene glycol (MEG) regeneration capabilities. The FPSO will have a condensate storage capacity of more than 1,000,000 barrels (approx. 137 000 m3) and will transfer the condensate to tankers for export to overseas markets. The gas will be transferred from the CPF via an 889-km-long gas export pipeline (GEP) to an onshore processing plant at Bladin Point in Darwin.