Categories
Nigeria

2016 Agbami field details

Source: Stanford university dept energy resources engineering, accessed 2020-01-08

Categories
Nigeria

Dec 2018 – Nigeria Egina 1st oil flow

The field has been developed by Total Upstream Nigeria (24%) in partnership with CNOOC (45%), Sapetro (15%) and Petrobras (16%). 5 wells in field. The Egina oil field is located approximately 150km off the coast of Nigeria in the Gulf of Guinea, at a water depth of around  1,600m. Located roughly 20km away from Akpo field, Egina field lies within oil mining lease block (OML) 130 and covers an area of approximately 500 square miles. (source: offshore-technology.com, accessed 2020-01-04)

Categories
Nigeria

2024 – Nigeria – train 7 start

Starting date: 2024
Location: Finima, Bonny Island, Nigeria

Final investment approval for the 8 million tonne per annum train 7 at Bonny was agreed december 2019. On completion the seventh train is expected to boost total production to 30 million tonnes per year. The 7th train project is expected to comprise: a liquefaction unit, 84200m2 storage tank, 36000m2 condensate tanks and 3 nr gas turbine generators (source: nsenergy published 2019-09-13, accessed 2020-01-03).

The project is owned and operated by Nigeria LNG – a joint venture between Nigerian National Petroleum Corporation (NNPC) 49%, Shell Gas 25.6%, Total 15%, and, Eni 10.4%. Construction for the project is by joint venture of Saipem, Chiyoda, and, Daewoo E&C.