The field has been developed by Total Upstream Nigeria (24%) in partnership with CNOOC (45%), Sapetro (15%) and Petrobras (16%). 5 wells in field. The Egina oil field is located approximately 150km off the coast of Nigeria in the Gulf of Guinea, at a water depth of around 1,600m. Located roughly 20km away from Akpo field, Egina field lies within oil mining lease block (OML) 130 and covers an area of approximately 500 square miles. (source: offshore-technology.com, accessed 2020-01-04)
Tag: CNOOC Limited
Dec. 23 – Liza 1st flow
Start date: 23rd december 2019
Location: Guyana – Stabroek field
Exxon announced 1st flow from Liza field. Expected to reach 120,000 barrels of oil per day. The FPSO Liza Destiny is moored 190 kms offshore Guyana at depths of between 1500-1900 m where four subsea drill centers support 17 wells. Estimated recoverable resource for Stabroek block is greater than 6 billion oil equivalent barrels. Esso Exploration and Production Guyana are operators with 45% interest, Hess Guyana Exploration Ltd holds 30%, and, CNOOC Nexen Petroleum Limited holds 25%. (source: company published data, accessed 2020-01-02)
Sep 2019 – FID signed Artic LNG 2
Start date: 2023
Location: Ultrenneye field
First gas projected from first train in 2023 of 6.6 mtpa. Trains 2 and 3 of comparable size to come on line in 2024 bringing potential supply to 19.8 mtpa.
The ownership structure for the project is 60% Novatek, 10% Total, 10% CNPC, 10% CNOOC, and, 10% by a consortium of Mitsui and Jogmec.